-40%

Biodiesel Processor Plans

$ 131.47

Availability: 41 in stock
  • MPN: MM63 Biodiesel Processor Plans
  • Condition: New
  • Brand: Murphy's Machines
  • Model: MM63 Biodiesel Plans
  • Country/Region of Manufacture: United States

    Description

    This listing is for a set of Murphy's Machines
    MM63 Biodiesel Processor Plans
    .  Over
    100 pages of instructions
    and detailed step by step drawings to help you construct a biodiesel processor capable of producing ASTM grade biodiesel from waste vegetable oil.
    Please google us, we have a great reputation for the highest quality plans and customer service.
    Making biodiesel is easy, economically building a biodiesel processor capable of properly reacting the fuel is a bit more difficult.
    Murphy's Machines has been in business for over 14 years, and we're still here because of the quality of our books and customer service.   We don't mess around with plastic tanks, under powered heating systems, or faulty designs born out of a "good enough" attitude.    Murphy's Machines processor plans will show you how to properly construct a biodiesel reactor for minimal cost and maximum performance.
    Our bare bone's plans come in a printed full color format with a clear sheet covering the front and back of the pages.    The plans are super easy to read and are accompanied by highly detailed 3d rendered drawings.
    We don't just tell you were to put the valve, we show you which way the handle should point!
    Our technical support is free and available 7 days a week.    What other company does that?
    Production Capacity:
    25 to 50 Gallons Per Batch (2 Hours)
    Reactor Volume:
    63 Gallons
    Settling Tank Volume:
    117 Gallons
    Wash Tank Volume:
    55 Gallons
    Dry Tank Volume:
    75 Gallons
    Cost Per Gallon:
    {{detail_product_description}}.75 to {{detail_product_description}}.95 (2007)
    Electrical:
    120 / 240 Optional
    Controls:
    Automatic Temperature Control
    Tools Required:
    Mig or Tig welder, ability to cut sheet metal.
    Skills Required:
    Proficient at welding, basic metal working skills, drilling holes, screwing pipes together, basic electrical skills.
    Materials:
    Steel, Bronze Valves
    Construction Cost:
    0 to 00 depending on options
    Construction Time:
    2 to 3 Weeks.
    Feedstock:
    Waste Vegetable Oil or Tallow